This table clarifies the responsibilities of the parties
involved in the construction project with a stucco cladding.
The parties referred to are the architect/owner, the
general contractor/builder and the wall and ceiling/plastering
contractor.
* The contractual agreement between
the builder/general contractor and the wall and ceiling
contractor/plastering contractor will supercede this
Scope of Responsibilities table. There-fore, these items
must be indicated in the construction documents and
reviewed at the pre-job meeting.
| Scope of Work |
Arch
Owner |
General
Contr. |
W/C
Contr. |
 |
1.
Construction documents design,drawings and
and specifications |
| 2. Site
conditions for storage and setting up of plastering
operation |
3.
Qualified plastering contractor (experience
in
scope of work and trained labor force) |
| 4. Awarding
the work to a qualified plastering contractor (experience
in scope of work and trained labor force) |
| 5.
Pre-job meeting to review all aspects of the stucco
system and interface with other building components |
| 6. Scheduling
and coordination of all trades |
| 7.
Tenting and heating for cold weather conditions* |
| 8. Buildings,
substrate, framing, sheathing, concrete, CMU* |
| 9.
Finish samples (color and
texture) |
| 10.
Approval of finish samples (color
and texture) |
| 11.
Submittals |
| 12.
Approval of submittals |
| 13.
Metal flashing,caps |
| 14. Windows/doors
flashing and installation |
| 15.
Roof,balcony flashing,caps,etc. |
| 16.
Flashing at heads of windows and doors* |
| 17.
Sealants and/or backing rod at windows, doors
or wall penetrations where construction documents
indicate* |
| 18.
Coordination of windows, doors and other devices
in wall surface* |
| 19.
Wall and ceiling penetration units, vents, pipes,
railings,electrical items,HVS,etc. |
| 20.
Scaffolding and/or other equipment necessary for
stucco work* |
| 21.
Water-resistant barrier as part of stucco
assembly |
| 22.
Location and type of trim accessory joints (control
joints, reveals, expansion joints and soffit vent
screeds) |
| 23.
Notification of unsatisfactory conditions before
stucco work |
| 24.
Correcting unsatisfactory conditions before stucco
work |
| 25.
Lath installation |
| 26.
Trim accessories: control joints, reveals, expansion
joints,casing beads,vent screeds,etc. |
| 27.
Preparation of CMU and/or concrete surfaces |
| 28.
Bonding agent over CMU and/or concrete surfaces
|
| 29.
Wood nailing strips |
| 30.
Finished wood trim |
| 31.
EPS implants |
32.
All equipment, tools, materials, and labor for
stucco system |
| 33.
Delivery and /or stocking of materials |
| 34.
Power and water |
| 35.
Safe grade conditions |
| 36.
Covering for protection from rain for finish work
|
| 37.
Protection from water runoff from roof, etc. |
| 38.
Covering and protection of building components from
stucco system operations |
| 39.
All phases of plastering work |
| 40.
Finish coat |
| 41.
Paint |
| 42.
Sealants |
| 43.
Quality control checklist |
| 44.
Clean up only stucco scope of work |
| 45.
Protection of finished wall surface from damage
after stucco work is completed |
| 46.
Protection of stucco phases from other construction
operations |
 |
| *
The contractual agreement between the builder/general
contractor and the wall and ceiling contractor/plastering
contractor will supercede this Scope of Responsibilities
table. There-fore, these items must be indicated
in the construction documents and reviewed at the
pre-job meeting. |