Home
Home
Distributors
What's New
Marquis
Beach Series
Marquizzo
Millenium
Free Stone
Poolcote
Poolcote Supreme
Poolcote Redo

Pool Warranties

Decks

Basecoats and Finishes

Architectural Information
Interior Products
Roofing

Millennium

DESCRIPTION

MILLENNIUM pool finish is the new technology in pre-packaged pool plaster that produces the protection to offer a smooth, white and long lasting, durable pool finish. MILLENNIUM pool finish is manufactured using only pure white aggregates, white cement, additives and polymers that improve handling properties and produce a finish that is resistant to etching, stains and discoloration. The new technology of the MILLENNIUM formulation produces a denser, harder and less water permeable finish that is more chemical and stain resistant.

FEATURES & BENEFITS

Slip resistant
Etch resistant
Stain resistant
Long-term performance

COVERAGE

MILLENNIUM is packaged in 80 lb. bags and must be applied at a rate not to exceed 25-30 square feet per bag. Coverage will vary depending on the porosity of the substrate.

SURFACE PREPARATION

Patch, level or resurface as required to provide a smooth substrate. Surface must be clean, cool, dry and free of dirt, grease, paint, release agents, curing agents, special surface hardeners, efflorescence or other foreign matter that may prevent or inhibit proper bonding.

NOTE: Only the experienced applicator at poolside can make the decisions as to what surface preparation may be required.

1) On previously plastered pools it is necessary to grind around the tile,
lights, returns, etc., to allow for a smooth transition.

2) On previously painted pools, the surface must be sandblasted to remove the old paint completely.

3) Thoroughly wash the surface with a TSP solution to remove body oils and suntan lotions. Acid wash with a 50/50 solution of muriatic acid and water, rinse with a neutralizing solution of baking soda and water, then finally rinse with clean water.

4) An application of Surebond 80 is highly recommended on previously
plastered surfaces as a bond or scratch coat to provide a uniform base for adhesion and even curing.

MIXING

Measuring equal amounts of water and mixing for equal amounts of time from batch to batch will ensure product consistency from batch to batch. Boxing different batch #'s will ensure final color uniformity. MILLENNIUM will require approximately 1½-2 gallons of potable water per bag. Start the mixing process by adding ? of the total required water to the mixer. Add the appropriate amount of MILLENNIUM and then add the remaining ? of the required water. Mix for approximately 5 minutes to bring the material to a workable consistency. Allow the mix to set for 5 minutes, then remix and add additional water if necessary to achieve the desired workable consistency. Do not retemper the mix after this.

APPLICATION - WHITE

1) The walls and bottom of the pool should be uniformly dampened with
water prior to the application to
reduce suction and allow for uniform
absorption.

2) Apply a tight thin coat of the MILLENNIUM and then double back with a second coat building the
thickness to ?".

3) Allow MILLENNIUM to stiffen sufficiently, allowing the water to leave the surface, before smooth troweling the finish.

4) Use tools that will not mar or stain the finish. For a smoother surface use a stainless steel trowel to finish.

5) Within a few hours after finishing, the pool should be filled with water balanced chemically at the onset to NSPI recommendations.

APPLICATION - COLORS

1) After MILLENNIUM has been properly mixed, it may be trowel or spray applied over a dampened substrate. The recommended thickness is ?".

2) Several trowel passes will be
required to compact and level as MILLENNIUM pool finish "stiffens".
DO NOT hard trowel the finish, as it is not necessary and will only create more work during the finishing process.

3) MILLENNIUM pool finishes are designed to be monolithic coatings. Sufficient personnel should be employed to eliminate cold joints. If the pool must be completed in phases, pre-determined stopping points must be used, such as tile lane markers, etc.

4) Once the surface of the MILLENNIUM pool finish has set hard enough to allow light foot traffic, remove the "cream" or "fat" to expose the quartz aggregate by water washing with a soft bristle broom or soft sponge and water. The timing of the water wash procedure can only be determined at the jobsite taking into account the factors of heat, humidity and substrate suction.

5) After the finish has been water washed, the applicator may elect to clean the "haze" off the quartz by washing with a 50/50 solution of muriatic acid and water. The experienced applicator will determine when an acid wash is needed.

6) It is acceptable to wait until the
following day to acid wash, but the finish must be water washed the same day as application to ensure adequate
quartz exposure.

7) If the entire finishing process is
completed in one day, fill the pool immediately. If you elect to leave the pool open until the next day to complete and acid wash, fill the pool immediately upon completion of the acid wash.

CLEAN UP

Clean all tools and equipment with water while still wet. Cured material can be removed mechanically or chemically.

STORAGE

Turn inventory regularly and keep bagged product protected from all forms of moisture, both direct and indirect, to assure maximum product usage, uniformity and productivity.

TECHNICAL SERVICES
(Available upon request)

MAINTENANCE

The long-term performance of MILLENNIUM will be directly proportional to the care taken during the filling process, the first ninety days of pool maintenance and consistent routine maintenance thereafter. Adjust the chemicals to the following levels in the order as recommended by PREMIX and NSPI:

a) pH 7.4 - 7.6

b) Alkalinity 100 - 125 ppm

c) Calcium 250 - 400 ppm

d) Chlorine gradually to 2 ppm

e) Total dissolved solids <1000 ppm

f) Cyanuric acid <50

NOTE: During the start-up phase keep the pool pump running 24 hours a day until the water clears. The pool should be brushed twice a day for the first week.

WARRANTY

The effectiveness of this product depends upon its proper application and the condition and preparation of the surface to which it is applied.
MILLENNIUM should be applied over surfaces prepared as previously described or over a cement base that has cured for at least 24 hours.

PREMIX-MARBLETITE MFG. CO. warrants its product, MILLENNIUM against failure for seven (7) years from date of installation. See the warranty for specific conditions, remedies and exclusions.

The information contained in this bulletin conforms to the standard
detail recommendations and specifications for the installation of the products manufactured by PREMIX-MARBLETITE and is presented in good faith. PREMIX-MARBLETITE assumes no liability, expressed or implied, as to the architecture, engineering or workmanship of any project.

CORPORATE

1259 N.W. 21st STREET
POMPANO BEACH, FL 33069
(954) 917-7665
(800) 432-5097
FAX (954) 917-2775


PREMIX-MARBLETITE MFG. CO.
325 OLD SANFORD OVIEDO ROAD
WINTER SPRINGS, FL 32708
(407) 327-0830
(800) 432-5539
FAX (407) 327-8942

AN III IMPERIAL INDUSTRIES COMPANY

back to top
 
Copyright 2002, Premix Marbletite, All Rights Reserved | Web Solutions: 14 East